Skip to content
  • Home
  • World News
  • Business
  • Aviation
195 news

195News

All the news that's fit to print

  • Home
  • World News
  • Business
  • Aviation
  • Toggle search form
  • Southwestern Scale Announces Expansion Into Texas Business
  • The Departure of Dr. Karen Donfried World News
  • Analyzing Growth Drivers, Market Share, Segments, Trends World News
  • DHS Announces Registration Process for Temporary Protected Status for Haiti World News
  • Brazilian Songstress K Sea Ya Takes Center Stage With New Release World News
  • Aircraft Cabin Lighting Market 2025 : Competitive Analysis and Industry Forecast Business
  • Fetal Monitoring Market Is Expected To Reach $6.2 Billion by 2032 Business
  • 2023 – The Year of the Diamond on Gossip Stone TV World News

HostDime Releases Design of Its New Tier IV Mexico Data Center

Posted on November 9, 2022 By NewsEditor
HostDime Releases Design of Its New Tier IV Mexico Data CenterHostDime Releases Design of Its New Tier IV Mexico Data Center
HostDime Releases Design of Its New Tier IV Mexico Data Center
HostDime's upcoming Tier IV Mexico datacenter


GUADALAJARA, Mexico - November 9, 2022 - (Newswire.com)

HostDime, a pioneer in global edge data center infrastructure, has released its design plans for its newest next-generation, purpose-built Tier IV data center facility in Guadalajara, Mexico, which will start construction in Q1 2023. HostDime is the owner, developer, and operator of this new data center facility, nicknamed "Andromeda".

Back in July 2022, HostDime announced that they purchased the three-acre land parcel in the Guadalajara, Mexico metro area; this will be HostDime's second carrier-neutral Guadalajara data center, with their current 20,000-square-feet facility currently at 80% capacity.

This new Mexico Data Center facility design will follow HostDime's Tier IV Data Center portfolio platform design standards, a rarity in the country. Certified by the Uptime Institute, it will only be the second Tier IV public data center in Mexico. Tier IV is the highest class certification a data center can receive. Often referred to as the four 9's, Tier IV data centers have 99.99% availability and often achieve 100% uptime due to their highly redundant power infrastructure. The facility will also incorporate ICREA V standards and thus will also be ICREA V certified by ICREA (International Computer Room Experts Association).

The new facility follows the iconic HostDime contemporary style of all the facilities it designs and builds. This style is a combination of the distinguished HostDime next-gen data center design, purpose-built highly redundant Tier IV power infrastructure, and client-centric colocation amenities. The data center facility will be 100,000 sq. feet in total size with 3MW of critical IT load capacity. The facility will feature three floors of data center space which will include data halls for private data center suites, colocation cage space, private lockable colocation racks, diverse MMR carrier rooms for interconnection, and a specific data hall for hybrid-cloud workload use cases.

The design of this new facility also incorporates additional vertical office floors on the front part of the data center. These office floors will accommodate local demand HostDime Mexico is seeing from potential clients who not only want to be tenants in the data center but also want to be office tenants. These office floors are not the typical office build out, as they will inherit the highly redundant power infrastructure being implemented in the data center. So this will accommodate unique use cases by companies who seek specialized technology office space while also being tenants of the data center.

"We are very excited to release the design of HostDime's New Data Center in Guadalajara, Jalisco, Mexico, in the cradle of innovation, 'The Silicon Valley of Mexico'. Guadalajara has innovative technology roots and being the second largest metropolitan city in Mexico, we know this new data center facility will properly serve the surrounding market. This data center will be constructed based on Tier IV and ICREA V standards. In addition, it will comply with all PCI data security standards, including PCI ISO 27001, ISO 14001, and ISO 9001 certifications, thus guaranteeing best processes and practices." - Eduardo Basulto Jiménez, CEO of HostDime México

The new HostDime facility will also be home to Guadalajara, Mexico's first peering exchange (GDL-IX), which will interconnect with other leading peering exchanges in other Mexico cities. To foster the growth of this new GDL peering exchange, HostDime has facilitated four diverse manhole entries into the facility where all local carriers can enter the facility to extend their fiber into the diverse Meet Me Rooms. The facility expects entry from leading local carriers such as Marcatel, MetroCarrier, Axtel, TotalPlay, Alestra, Cogent, Bestel, Flo Networks (Transtelco), and Telmex. This GDL peering exchange ecosystem will allow carriers and tenants to interconnect and be able to serve content to over 90% of the population in Mexico at the lowest latency. This new data center will be one of the most interconnected facilities in Mexico in the next few years and will be a main interconnection point for transit and peering in Guadalajara.

Client amenities include a client reception area, a colocation lounge for staging servers in a quiet climate-controlled atmosphere, and private dedicated warehouse storage space for an array of equipment storage needs. All the rooms will have fiber interconnecting them. There will also be a unique mid-floor indoor/outdoor event space to host technology-related conferences in the Guadalajara Metro area. If that's not enough, there are also plans to install a helicopter pad on the roof to transport clients to the facility in emergency situations around the highly congested Guadalajara, Mexico metro area.

The facility is expected to be commissioned for production in 2024. This announcement comes on the heels of the opening of HostDime Colombia's new Tier IV data center in Bogota, Colombia; the official grand opening is Nov. 18. Additionally, HostDime's flagship headquarters and Tier IV Orlando data center will be commissioned for production in late Q1 of 2023.

HostDime is a global native carrier-neutral data center infrastructure company operating purpose-built public data center facilities in Mexico, Brazil, Colombia, and our flagship facility in Florida, USA, and with owned networks in the U.K., India, and Hong Kong.

HostDime's mission is to design, build, and operate purpose-built, next-gen, public data center facilities in emerging markets around the globe. HostDime offers an array of cloud-native infrastructure products and services including physical bare-metal servers, cloud servers (both private and public), colocation (cages and racks), and Hardware-as-a-Service in all our unique global edge data center locations. HostDime also provides professional managed services on all core products globally.


Contact Information:
Jared Smith
Director of Marketing
[email protected]
386-341-0855
Related Files
Andromeda_3D_slow.mp4

Related Images
HostDime's upcoming Tier IV Mexico datacenter
HostDime's upcoming Tier IV Mexico datacenter


100,000-square-foot facility with 3MW of critical IT load capacity
100,000-square-foot facility with 3MW of critical IT load capacity


Roof helicopter pad
Roof helicopter pad




Press Release Service by Newswire.com

Original Source: HostDime Releases Design of Its New Tier IV Mexico Data Center
Business

Post navigation

Previous Post: Is digital media good for democracy? BBC News
Next Post: Mokaram Law Firm Gives Back to Houston Families at First Annual Thanksgiving Event: 1,000 Frozen Turkeys to Be Given Away Nov. 18 at 2500 West Loop South, Houston, Texas 77027

Related Posts

  • The Hydroponics Fertilizer Additive Market Is Projected To Reach $6.2 Billion By 2028, Growing At A CAGR Of 7.6% Business
  • 3 Sisters and Their Fresh Perspective on Sensitive Skin Care Business
  • EuroChem Group AG Committed to Continuing Operations as UN Warns of Global Food Emergency Business
  • Reshaping Cocoa Communities Through Clean Water Initiatives Business
  • The Reverse Osmosis (RO) Membrane Market is projected to grow to USD 11.05 Billion by 2030, expanding at a CAGR of 8.9% Business
  • With IBN Technologies Expert US Payroll Services, Businesses Transform Payroll Operations Business
July 2026
M T W T F S S
 12345
6789101112
13141516171819
20212223242526
2728293031  
« Jun    
last celebrity gossip
Gossip Stone - celebrity life and gossip

Recent Posts

  • Suncoast Web Marketing Earns Four Best of Florida Nominations as Demand Grows for Website Consulting ServicesJuly 22, 2026
  • GT Experience by Kenichi Mizuno Wins Bronze in A’ 3D Printing Industry AwardsJuly 22, 2026
  • Hephae Energy Technology Raises $17.8 Million for Commercial Deployment of Superhot Drilling Tech to Advance GeothermalJuly 21, 2026
  • Vero Beach’s Barrier Island Rides the 2026 Luxury SurgJuly 21, 2026
  • Villa Fortuna by S.A.I.T. Studio Wins Bronze in A’ Architecture AwardsJuly 21, 2026
Brand Values Content
VUGA Enterprises - media network PR & Marketing
  • Dr. Janet Smith Warfield Launches New Book: ‘Surrendering into Soul: A Heroine’s Journey’ World News
  • Reflections on my first year as CDO for the US Department of Commerce Business
  • Author Jeff DeVore Invites Readers to Explore Their Sexual Selves with Sex As . . . A Journal for Your Life World News
  • Wood Products Market Size, Share And Growth Analysis For 2024-2033 World News
  • The Secure Messaging In Healthcare Market to Grow Beyond Linear Progression at a CAGR of 20% World News
  • Pinpoint Labs Unveils SharePoint Collector V6, a Streamlined Solution for Efficient Data Collection Business
  • webinar de expertos organizado por FXGlobe Business
  • KogoPAY Champions Fintech’s Role in Climate Action at Green Technology Expo Business
aerospace company
stem cell clinic in kiev
medical spa in miami
Fashion TV free

Copyright © 2023 195 News. All Rights Reserved by Coolaser | Partner of VUGA Enterprises |  Advertising: Get Published

Powered by .