Skip to content
  • Home
  • World News
  • Business
  • Aviation
195 news

195News

All the news that's fit to print

  • Home
  • World News
  • Business
  • Aviation
  • Toggle search form
  • African Diaspora International Film Festival Returns to Chicago’s FACETS Film Forum with Global Lineup World News
  • How Clio’s Launch//Code 2022 Winners Are Leading the Way to Legal Practice Agility Business
  • America’s Tallest Digital Countdown Clock & Fireworks Light-Up Paramount Miami Worldcenter Tower World News
  • ‘Have You Seen My Daddy?’ by Pastor John R. Peyton is a Story of Redemption, Fatherhood, and Faith World News
  • G. Bradley Davis Captures Readers with Powerful Tales of Courage, Identity, and Transformation World News
  • War in Ukraine, Analytics. Day 1306: Russia Refusing Peace Track. Arestovych, Shelest. World News
  • Aadmi Announces Spin-Off EOR Service to Create Engage Anywhere Business
  • American Marketing Association Chicago Names Meghan Hurley as ‘Marketer of the Year’ Business

Updates on Grounding of Boeing 737-9 MAX Aircraft

Posted on January 22, 2024 By NewsEditor

Updates on Grounding of Boeing 737-9 MAX Aircraft

Wednesday, January 17, 2024

This information is preliminary and subject to change.

After taking decisive action to ground 171 Boeing 737-9 MAX airplanes, the FAA is now investigating Boeing’s manufacturing practices and production lines, including those involving subcontractor Spirit AeroSystems, bolstering its oversight of Boeing, and examining potential system change. 
 
On Friday, the FAA announced requirements for a rigorous inspection and maintenance process as a new and necessary step before the FAA contemplates any further steps in the process to return Boeing 737-9 MAXs to service. The first 40 inspections that are part of that process are now complete, and the FAA will thoroughly review the data from them. All 737-9 MAX aircraft with door plugs will remain grounded pending the FAA’s review and final approval of an inspection and maintenance process that satisfies all FAA safety requirements. Once the FAA approves an inspection and maintenance process, it will be required on every grounded 737-9 MAX prior to future operation. The safety of the flying public, not speed, will determine the timeline for returning these aircraft to service.   
 
The FAA is supporting the National Transportation Safety Board’s investigation into Alaska Airlines Flight 1282. The NTSB is in charge of the investigation and will provide any updates.  


January 11, 2024

This incident should have never happened and it cannot happen again. FAA formally notified Boeing that it is conducting an investigation to determine if Boeing failed to ensure completed products conformed to its approved design and were in a condition for safe operation in compliance with FAA regulations. This investigation is a result of an incident on a Boeing Model 737-9 MAX where it lost a “plug” type passenger door and additional discrepancies. Boeing’s manufacturing practices need to comply with the high safety standards they’re legally accountable to meet. The letter is attached.
 
The safety of the flying public, not speed, will determine the timeline for returning the Boeing 737-9 MAX to service. 


January 9, 2024

Every Boeing 737-9 MAX with a plug door will remain grounded until the FAA finds each can safely return to operation. To begin this process, Boeing must provide instructions to operators for inspections and maintenance. Boeing offered an initial version of instructions yesterday which they are now revising because of feedback received in response. Upon receiving the revised version of instructions from Boeing the FAA will conduct a thorough review.

The safety of the flying public, not speed, will determine the timeline for returning the Boeing 737-9 MAX to service.


January 8, 2024

The FAA has approved a method to comply with the FAA’s Boeing 737-9 MAX emergency airworthiness directive, and it has been provided to the affected operators.

The FAA’s priority is always keeping Americans safe. In that spirit, Boeing 737-9 MAX aircraft will remain grounded until operators complete enhanced inspections which include both left and right cabin door exit plugs, door components, and fasteners. Operators must also complete corrective action requirements based on findings from the inspections prior to bringing any aircraft back into service.

The FAA will continue to support the National Transportation Safety Board’s investigation into Alaska Airlines Flight 1282. The NTSB is in charge of the investigation and will provide any updates.


January 7, 2024

The FAA’s first priority is keeping the flying public safe. We have grounded the affected airplanes, and they will remain grounded until the FAA is satisfied that they are safe.


January 6, 2024

The FAA ordered the temporary grounding of certain Boeing 737-9 MAX aircraft operated by U.S. airlines or in U.S. territory.
 
“The FAA is requiring immediate inspections of certain Boeing 737-9 MAX planes before they can return to flight,” FAA Administrator Mike Whitaker said. “Safety will continue to drive our decision-making as we assist the NTSB’s investigation into Alaska Airlines Flight 1282.”
 
The Emergency Airworthiness Directive (EAD) requires operators to inspect affected aircraft before further flight. The required inspections will take around four to eight hours per aircraft.
 
The EAD will affect approximately 171 airplanes worldwide.


Aviation

Post navigation

Previous Post: FAA Statement on Recommending Visual Inspections of Boeing 737-900ER Mid-Exit Door Plugs
Next Post: LTV Day 554 -Drone Strategies. Power of People: Power of Fallacies – Latynina.tv – Alexey Arestovych

Related Posts

  • HIF Global and Government of Uruguay Sign Agreement to Accelerate e-Fuels Project in Paysandú Aviation
  • Lazarus Alliance Expands CMMC Certification Services to Support Defense Contractors Globally Aviation
  • FAA Establishes Independent Aviation Safety Review Team Aviation
  • Ducommun Incorporated Announces the Appointment of Clay Bringhurst to Vice President, Engineered Products Aviation
  • Satellite Services Market Size Expected to Reach $241.1 Billion by 2033 Aviation
  • Delivery Drone Market is set to reach USD 3.2 Billion by 2030, Growing at a CAGR of 49.00% Due to Rising UAV Adoption Aviation
July 2026
M T W T F S S
 12345
6789101112
13141516171819
20212223242526
2728293031  
« Jun    
last celebrity gossip
Gossip Stone - celebrity life and gossip

Recent Posts

  • Who Is Mr.Putin – Putinism v03: Who Is The Noob Here? Novichok, Polonium and organized crime.July 16, 2026
  • Why Cross-Border Transfers Are Moving Toward Reward-Based Remittance ModelsJuly 15, 2026
  • ZenaTech’s ZenaDrone Moves IQ Aqua Underwater Mine-Detection Drone into U.S. Field Testing in FloridaJuly 15, 2026
  • Party Hire Group appointed by NSW Department of Education as a preferred supplier for stage supplyJuly 15, 2026
  • Ecer.com Empowers Enterprises to Achieve a “Perennially Online” Global Business Model as Mobile B2B Trade AcceleratesJuly 14, 2026
Brand Values Content
VUGA Enterprises - media network PR & Marketing
  • War in Ukraine. Analytics. Day 700 pt2: What Will Convince Ukraine to Grow Up on the 700th Day? World News
  • FakeEyes to Unveil Walking Assistance Platform for the Visually Impaired at CES 2026 Business
  • Pioneering the Future of Global Communication in China World News
  • Claire Sharpnack Joins Cleveland-Based Software Company Business
  • A New Horizon for Global Healthcare Solutions Business
  • NYS Inspector General and Navy SEAL to Speak at NYACT Conference for Law Enforcement and Insurance Professionals Business
  • War Day 678, pt1: Ukrainian Stubbornness vs. Russian Long Will World News
  • D’Art executed Retail Transformation project for Berger Paints Business
aerospace company
stem cell clinic in kiev
medical spa in miami
Fashion TV free

Copyright © 2023 195 News. All Rights Reserved by Coolaser | Partner of VUGA Enterprises |  Advertising: Get Published

Powered by .